wind farm will be built from 290 GW
Adapted from Teleradioerre
CERIGNOLA, Tuesday, September 28, 2004 - 14:46 PM
wind farm will be built 290 GW
Four wind turbines with a total of one hundred wind turbines will be built on the territory of the town of Cerignola. This was decided last night, the City Council. The feasibility study, entrusted to Enel. Hydro, lasted for several months as a result of the simulation area southeast (1,800 hectares) has been identified as an area more suitable for the installation of the equipment. E 'has already started a pre-assessment on all the constraints of compatibility with the eco-environment.
At full capacity the plant will produce 4, potentially, well 290 GW per year. The first plant to be built, after the public tender, will be composed of fifteen wind turbines that will produce 45 GW, covering the needs of electricity supply to 26,000 households. The excess production, when all the plants will go fully operational, will be sold. The City will
expropriation of areas where there will be allocated facilities. "The approval of the City Council we can define a wind farm was an important moment for our city - the alderman said Santangelo. - For Cerignola the transaction at no cost, as is the consideration for the execution of the feasibility study, and the burden will be borne by the expropriation of the company that has submitted the best offer during the course of the race. In addition, the Assessor concluded Santangelo, an allowance of € 10,000 is provided for each wind turbine, in addition to 4% of revenues earned by the company and 2% on the sale of "green certificates".
0 comments:
Post a Comment